Sunday, February 16, 2025
Advertisements
ad: Beal & Hebert Attorneys
Sunday, February 16, 2025
Advertisements
ad: Beal & Hebert Attorneys

Closure for Portion of NW Bound Lanes in 100 Block of Doucet Rd

ad: Lazy Caveman Boudin

Submitted by Lafayette Consolidated Goverment

LAFAYETTE, LA (January 16, 2025) – Portions of the northwest-bound left-turn and through lanes within the 100 block of Doucet Road are scheduled to be closed from January 22 through February 11, 2025 (weather permitting) to allow for sewer infrastructure repairs.

Advertisements
ad: Master Drain - Todd Billiot

A Lafayette Utilities System (LUS) contractor will perform the repairs within the roadway. Motorists traveling northwestbound on Doucet Road approaching Johnston Street will encounter lane reductions before the work area.

Lafayette Consolidated Government’s Traffic, Roads, and Bridges Department urges drivers to proceed with caution through the work zone for their safety and the safety of workers.

Signup for FREE Daily Digest

Join one of our email lists to receive a daily digest of the latest articles and/or Congressional News from Senators Kennedy and Cassidy and Representative Higgins, which is sent straight to your inbox.

Choose list(s)
Invalid email address
We promise not to spam you. You can unsubscribe at any time.

Disclaimer: Opinions, editorials, letters to the editor, or content from external sources published on BY Local News LLC do not reflect the opinions or endorsement of BY Local News LLC or its owner.

RELATED ARTICLES