Tuesday, March 25, 2025
Advertisements
ad: Beal & Hebert Attorneys
Tuesday, March 25, 2025
Advertisements
ad: Beal & Hebert Attorneys

TEMPORARY CLOSURE: East Lewis Street Bridge for Repairs

Advertisements
ad: Lazy Caveman Boudin

Submitted by Lafayette Consolidated Goverment

TEMPORARY CLOSURE

LAFAYETTE, LA (November 20, 2024) – Lafayette Consolidated Government (LCG) announces the temporary closure of the E. Lewis Street Bridge beginning at 7:00 a.m. on Saturday, November 23, until 5:00 p.m. on Sunday, November 24, 2024.

Advertisements
ad: Master Drain - Todd Billiot

The closure is necessary for the final portion of the project, which includes an epoxy-urethane coating to seal the deck and add a friction course. This will extend the life of the structure and maximize longevity.

NOW OPEN

LAFAYETTE, LA (Novembe 8, 2024) – Lafayette Consolidated Government (LCG) announces the reopening of the E. Lewis Street bridge on the UL Lafayette Campus, crossing Coulee Mine. Repairs consisted of strengthening and painting the steel girders Vermilion Red, concrete patching, constructing new drainage catch basins, constructing ADA compliant sidewalk slopes leading up to the bridge, and sealing and coating the deck.

An epoxy-urethane coating to seal the deck and add a friction course will be applied on the bridge in the near future. Any related closures will be scheduled for a weekend date to minimize disruption to local traffic.

ORIGINAL

LAFAYETTE, LA (July 29, 2024) – Lafayette Consolidated Government (LCG) announces the temporary closure of the East Lewis Street bridge crossing Coulee Mine for necessary repairs. The initial closure is scheduled from July 30 to August 15, 2024. This period will allow for essential maintenance and ensure the safety and integrity of the bridge.

In consideration of the University of Louisiana at Lafayette’s move-in dates, the E. Lewis Street bridge will reopen to traffic from August 16 through August 18. Following these dates, the bridge will close again on August 19 for approximately two months to complete the remaining repairs.

Detour routes will be clearly marked and available to ensure minimal disruption. Local access will be maintained throughout the closure period.

Detour Routes:

  • Johnston Street
  • E. St. Mary Boulevard
  • Girard Park Circle

LCG appreciates your patience and understanding during this time as we work to enhance infrastructure throughout Lafayette Parish.

Signup for FREE Daily Digest

Join one of our email lists to receive a daily digest of the latest articles and/or Congressional News from Senators Kennedy and Cassidy and Representative Higgins, which is sent straight to your inbox.

Choose list(s)
Invalid email address
We promise not to spam you. You can unsubscribe at any time.

Disclaimer: Opinions, editorials, letters to the editor, or content from external sources published on BY Local News LLC do not reflect the opinions or endorsement of BY Local News LLC or its owner.

RELATED ARTICLES